Difference between revisions of "10 Thesen"
From OOEM
Jump to navigationJump to search
AndreasLeue (talk | contribs) (New page: # Mythos: "Business vs. IT"-Kampf (sie haben keine Chance) # Mythos: Fachprozesse = BPM(N)/EPK = Wandschmuck # Mythos: IT = UML = technisch = verkompliziert # Es gibt nur eine Wirklichkeit...) |
AndreasLeue (talk | contribs) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{T| | |||
# Mythos: "Business vs. IT"-Kampf (sie haben keine Chance) | # Mythos: "Business vs. IT"-Kampf (sie haben keine Chance) | ||
# Mythos: Fachprozesse | # Mythos: Fachprozesse {{--}} BPM(N)/EPK {{--}} Wandschmuck | ||
# Mythos: IT | # Mythos: IT {{--}} UML {{--}} technisch {{--}} verkompliziert | ||
# Es gibt nur eine Wirklichkeit (und ein Single Source Modell ist sowieso besser) | # Es gibt nur eine Wirklichkeit (und ein Single Source Modell ist sowieso besser) | ||
# Zu einfach: Prozeß | # Zu einfach: Prozeß {{--}} Funktionshierarchie | ||
# Ablauf und Struktur gehören zusammen (Prozesse und Objekte) | # Ablauf und Struktur gehören zusammen (Prozesse und Objekte) | ||
# Abläufe nicht zementieren (Kontrollfluß so spät wie möglich codieren) | # Abläufe nicht zementieren (Kontrollfluß so spät wie möglich codieren) | ||
Line 10: | Line 11: | ||
# Blick in die Kristallkugel: UML (aber welche Version?) | # Blick in die Kristallkugel: UML (aber welche Version?) | ||
Mit diesen Thesen befaßte sich der [[Vortrag]] am 8.12.2009. | | | ||
# Myth: "Business vs. IT"-Infighting (they have no chance) | |||
# Myth: Business Process {{--}} BPM(N)/EPC {{--}} Schrankware | |||
# Myth: IT {{--}} UML {{--}} technical {{--}} overly intricate | |||
# There's only one reality (and a Single Source Model is better, anyway) | |||
# Too simple: Process {{--}} Funktion Hierarchy | |||
# Flow and Strcuture belong together (Processes and Objects) | |||
# Do not hardcode flows (fix controllow as late as possible) | |||
# Object Orientation? Object Orientation! | |||
# It can't get any easier | |||
# Look in the crytal ball: UML (but which version?) | |||
}} | |||
Mit diesen Thesen befaßte sich der [[Vorträge{{!}}Vortrag]] am 8.12.2009. | |||
The [[Vorträge{{!}}speech]] at 8.12.2009 addressed these theses. |
Latest revision as of 17:38, 14 July 2010
- Myth: "Business vs. IT"-Infighting (they have no chance)
- Myth: Business Process = BPM(N)/EPC = Schrankware
- Myth: IT = UML = technical = overly intricate
- There's only one reality (and a Single Source Model is better, anyway)
- Too simple: Process = Funktion Hierarchy
- Flow and Strcuture belong together (Processes and Objects)
- Do not hardcode flows (fix controllow as late as possible)
- Object Orientation? Object Orientation!
- It can't get any easier
- Look in the crytal ball: UML (but which version?)
Mit diesen Thesen befaßte sich der Vortrag am 8.12.2009. The speech at 8.12.2009 addressed these theses.